Details: construction of embankment with material obtained from borrow pits with a lift upto 1.5 m, transporting to the site spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m m as per technical specification clause 301.5 . 1000 m lead construction of embankment with material obtained from borrow pits with a lift upto 1.5 m, transporting to the site spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 100 m m as per technical specification clause 301.5 . 100 m lead construction of subgrade and earthen shoulders :-construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacted to meet requirement of table 300.2 with lead upto 1000 m as per technical specification clause 303.1. granular sub-base with coarse graded material (table:- 4002)- for grad
Sector: Road development