Details: initial rehabilitation clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per mord technical specification cluase 201.1.including cost. , conveyance, royalty, cess & taxes of all materials & cost of all labour & t&p required for the work etc complete as per specification & direction of engineer-in charge. 1) sh-30 o berubadi (or-11-219) 2) pwd road to odr ustali (or-11-224) earth work in road embankment in hard soil with all leads and lift including rough dressing breaking clods and leveling bed and depositing the excavated materials away from the working area including cost. , conveyance, royalty, cess & taxes of all materials & cost of all labour &
Sector: Road development