Details: kf road to fultali (l=2.080 km, package no: tr-03-105, l 034 ) clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation , grass, bushes, shrubs,saplings and trees of girth upto 300 mm , removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. by manual means in area of non-thorny jungle construction of embankment with material obtained from borrow pits construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as per technical specification clause 301.5 construction of subgrade and earthen shoulders construction of subgrade and earth
Sector: Road development