Description: PMGSY I work Name of Work Construction of Road from Premtala to Mulyarampara including One Long span Bridge Length 2 06 km Package no TR 03 170 Link no L024 under Dasda Block
Details: 1. Premtala to Mulyarampara including Long span Bridge(Length=2.446 km)(Package no. TR-03-170)(Link no. L024) under Dasda Clearing and grubbing road Land Clearing and grubbing road Land including uprotting wild vegetation,grass,bushes,shrubs,saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned,upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201 (A) by Mechanically (I)in area of non thorny jungle Setting out (As per drawing enclosed) with reference pillars on both sides of the formation width burjes @ 50m interval using PCC with jhama brick aggregate for all class of soil including marking of centre line, setting out curves and recording of levels etc. For all classes of soil. Compacting orginal ground supporting embankment. Loosening, leveling and compacting
Sector: Road development