Details: 1. l402- 2 no. regrouping colony to ompi raban para pmgsy road, block- ompi. (length- 0.771 km). clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and of serviceable material to be used or auctioned upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. cutting of trees, including cutting of trunks , branches and removal of stumpscutting of trees, including cutting of trunks, branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per technical specification clause 201. girth above 300 mm to 600 mm girth above 600 mm to 900 mm setting out setting out (as per drawing enclosed) with reference benchmark 1 no. , working benchmark 4nos.
Sector: Road development