Details: 1. removal of existing siemens unit:disconnect and un-install the existing siemens units. ensure no disruption to power supply andsystem integrity during the removal process.2. installation and configuration of the new :install a new marine-approved , integrate the new into the dp operation. ensure seamlesscommunication with generators, breakers, and monitoring systems.3. load transfer, load sharing, and safety:ensure proper synchronization and breaker control. maintain safety interlocks to prevent overloads andsystem failures. provide all safety features with existing msb mechanisms as per offshore vesselstandards.4. testing and validation:perform system-wide testing under all load-sharing scenarios. conduct functional tests on generatorsynchronization and breaker operations. execute safety and failure recovery tests to verify systemstability.5. compliance and safety:ensure adherence to functional safety and power automation standards. implement protectionmechanisms to prevent
Sector: Harbor