Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. mord 2.2 excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment up to a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per clause 302 mord 3.5 construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 mord 3.3 construction
Sector: Road development