Details: preparation of dprs for roads and bridges including road survey, traffic survey with automatic traffic counter, soil investigation including cbr tests, structural design, estimation and preparation of detailed project report (as per pmgsy-iv guidelines / circulars issued from time to time) as per irc:sp:72 incl l-section and vetting of dprs from state technical agency (coordinator nit srinagar) for pmgsy-iv (new connectivity) schemes in division kupwara complete job. consultancy services for bridge design (upto 50m) , including feasibility study, site investigation, geotechnical analysis, hydraulic analysis, structural design, preparation of detailed project report (dpr), cost estimation, and preparation of tender documents, including third party vetting from nit srinagar or diqc gogjibagh and layout of plan at the site of work and frequent site visits during the execution. (rate quoted as fraction of estimated cost). laboratory cbr test (as per is 2720 part 16) and atterberg's limits
Sector: Road development