Details: providing & fixing of working benchmark pillars 01 nos. per km & 04 nos. of reference pillars required for 1 km. as per drawings given and direction of e/i (working benchmark pillars) reference pillars clearing and grubbing road land (by manual means) including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300mm, removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification-clause 201.1 and direction of e/i excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 construction of embankment with material obtained from borrow pits with a lift upto 1.5 m, transporting to the site spreading, grading to required an
Sector: Road development