Details: kolhuya hari sah road me nakubi house chowk to nat toli (i) construction of reference & working benchmark = 01 nos. & 3 nos. respectively (ii) construction of refrence pillars/ burjees = 24 nos. clearing and grubbing road landclearing and grubbing road land ( by manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of e/i box cutting :- excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per technical specification clause 302.3 construction of embankment with material obtained from roadway cuttingconstruction of embankment with ap
Sector: Road development