Details: clearing scrub jungle including all labour charges for burrying and burning etc., earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting sidedrain etc, complete. as per ss20 a collection and supply of us gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete, ch 0/00-1/00 ch 1/00-2/00 ch 2/00-3/00 ch 3/00-3/190 advance patch work for making up the undulation in the existing b.t surface to an average thickness of of 50mm using 45mm irc size hbg metal ch 0/00-1/00 ch 1/00-2/00 ch 2/00-3/00 ch 3/00-3/190 advance patch work for making up the undulation in the existing b.t surface to an average thickness of of 25mm using 13.20mm irc size hbg metal ch 0/00-1/00 ch 1/00-2/00 ch 2/00-3/00 ch 3/00-3/190 providing and laying tack coat over the bt surface using 3.00 kg of bituminous emulsion for 10 sqm. including cost of bituminous emulsion which will be
Sector: Road development