Details: t11 madakkakkal mullassery center road (length 3.095 km) clearing and grubbing clearing grass and removal of - clearing grass and removal of upto a distance of 30m outside the priphery of the area as per technical specification clause 200.1 earth work - in excavation / cutting excavation in soil using hydraulic excavator and tippers with disposal upto 1000m - excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per technical specification clause 302.3 construction of embankment with material obtained from roadway cutting - construction of embankment with approved material deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300
Sector: Road development