Details: foundation excavation for structures earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i. ordinary soil i) upto 3m depth providing and laying of pcc m15 levelling course 100mm thick below the pile cap. ii. pcc grade m-15 (levelling course for pile cap) substructure r.c.c. grade m-30 in substructure complete as per dwg & tech specification rcc m-30 i) upto 5m height (using concrete mixer) supplying, fitting and placing hysd bar reinforcement (fe 415) in substructrue complete as per drawings and technical specification clauses 1002, 1005, 1010 & 1202 providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia ac pipe extending through the full wi
Sector: Road development