Details: earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. i) upto 3m depth providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications clause 802, 803, 1202 & 1203.ii. pcc grade m-15 (levelling course) r.c.c. grade m-35 in substructure complete as per dwg & tech specification i) upto 5m height (using concrete mixer) r.c.c. grade m-35 in substructure complete as per dwg & tech specification ii) from 5m upto 10m height (using concrete mixer) supplying, fitting and placing hysd bar reinforcement (fe 500) in substructrue complete as per drawings and technical specification clauses 1002, 1005, 1010 & 1202 providing weepholes in brick masonry/stone masonry, plai
Sector: Road development