Details: 1.gandacherra town circular road (length-7.070 km). clearing and grubbing road land clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and of serviceable material to be used or auctioned upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201. setting out setting out (as per drawing enclosed) with reference benchmark 1 no. , working benchmark 4nos. per km and near all drainage structure and bridges and reference pillars on both sides of the formation width burjes @50m interval using pcc with jhama brick aggregate for all class of soil including marking of centre line, setting out curves and recording of levels etc. by surveyor (ii) excavation in soil with dozer with lead upto 100 m. excavation for roadway in soil by mechanical mea
Sector: Road development