Details: construction of high level bridge across gunjana river in km 8/700 to km 8/800 on the road from yarramitta to vv kandirika r&b road to cra road at shantinagar of kodur mandal in ysr kadapa district bridge portion earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 mord / 304 morth ,including overhead charges & contractors profit but excluding gst.in all types of soil including ordinary rock by mechanical means (0-3m) earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom
Sector: Road development