Description: Repairs to Hard standing plinth protection and wire mesh covering etc of static water tanks inside factory area at OFMK Name of Work Repairs to Hard standing plinth protection wire mesh covering etc of static water tanks inside factory area at OFMK
Details: Demolition of Concrete of any description and in any position not otherwise specifically provided for Excavation over areas not exceeding 1.5m depth in hard/dense soils and getting out. Surface excavation not exceeding 30 cm deep and averaging 15 cm deep in hard / dense soil and getting out. Removal : Removing excavated material(soils) exc. 500m but n.exc 1500m and depositing where directed. Moorum : Supply and filling of Moorum/Red Bajri, filling in floors or pavings, laid in layers n exc. 15 cm thick, spread, levelled and rammed including watering complete all as specified and directed. Hard core : Hardcore with broken stone/ boulders of gauge not exc. 63mm, deposited, spread, levelled in layers not exc. 15 cm thick and watered and rammed to a true surface, complete all as specified and directed. Stone Masonry : Walling of squared rubble, regular coursed, well bonded ,bedded and solidly hearted, built in CM 1:6 complete all as specified and directed. Pointing: Flush pointing