Details: name of the monument / site: alampur group of temples, alampur manually removing of existing rough stone pitching (buttressing) after carefully propping the roof slabs and roof beams with sand bags/tubular scaffolding pipes etc. carefully at damaged locations inside arka brahma temple including cost of all labour, tools, conveyance charges from temple premises to main gate (head loads), lead of 100mtrs, lift charges, loading, unloading(away from the town using tractors lead is 5km), applicable taxes etc. all complete as per the directions of department officials.(actual quantities may vary as per site conditions) restoration of missed prakara wall portions inside arka brahma temple for propping the roof beams and roof slabs with monument matching granite stones (light red colour) of average finished sizes 0.90m x 0.30m x 0.15m to 0.60m x 0.23m 0.15m (at window portions the size of lintels and vertical props may vary as per the site condition) including cost of all materials and tool
Sector: Museums