Details: surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift upto1.5 m. all kinds of soil. clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. beyond 30 cm girth up to and including 60 cm girth supplying and stacking at site. moorum. spreading of available murrum/good earth stacked at site of 75mm thick murrum around the ground, watering and compacting by ramming etc all complete as per the directions of engineer in charge including preparation of the surface for rolling. supplying and stacking at site. good earth carting out of building / malba / similar unserviceable material including loading, transporting, unloading to munic
Sector: Telecommunication