Details: maintenance of arbo assets at diat, girinagar, pune under emu(r&d), pune (percentage oh & cp to quote on this amount only)note:a) see appendix-e for details of wages and other elements & cost of items included in the amount.b) the % (percentage) quoted is deemed to include the following:-i) contractor profit, over heads & service charges for complete scope of work including minimum wages, vda, epf & esi (employer share only) and bonus.ii) cost of all items/ tools (if any required over and above already included in the element by department in the estimate i.e appendix ‘e’).iii) cost of rubber hose pipes & minor repair etc., to the pumps and connected items etc., to supply water to the plants/assets from the source of supply.iv) cost of transportation of water/ arranging power supply tapping etc., from the nearest source in case of failure of existing system (till alternative arrangements are made by the department).v) cost of replacing the arboriculture assets damaged due to improper