Description: Removal of ash accumulated due to clearing of foreign material, open ashing from APH and Duct Hoppers, Bottom Ash Hoppers Unit-1 and 2, including surrounding drains, trenches, drain sump and transporting to a distance of upto 5 KM for disposal at a location Ash Pond directed by Engineer -in-charge for the year 2025-26
Sector: Generation