Details: removal of existing fencing with angles in plant site at various locations and handling over of the materials to the department store., all complete as per specifications and as per directed by engineer in charge. demolising stone rubble masonry manually/ by mechanical means including stacking of serviceable and disposal of unserviceable material within 50 meters lead as direction of engineer-in-charge in cement mortar disposal of scrap materials, debris, dismantled rr masonary, brick work and concrete and other waste materials etc with the help of jcb( excavator dozer) at various locations of the plant including removal loading, unloading and disposal of the same within the plant premises etc., complete as per specifications and as directed by the engineer-in-charge. earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth
Sector: Water Resource Department