Details: earth work in excavation by mechanical means (hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by engineer-incharge.all kinds of soil providing and fixing chlorinated polyvinyl chloride (cpvc) pipes, having thermal stability for hot & cold water supply, including all cpvc plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes & fittings with one step cpvc solvent cement and testing of joints complete as per direction of engineer in charge.internal work exposed on wall25 mm nominal dia pipes supplying and fixing of cable route marker with 10cm*10cm*5cm thick g.i plate with inscription there on,bolted/welded to 35mm*35mm*6mm angle iron,60cm long and fixing the same in the ground. supplying and fixing of brass ball valve with necessary fittings as per direct
Sector: Science University