Details: 1. scaffolding is included for all the items upto 3.5 m whether specified in the item or not, the contractor shall quote rates accordingly2. the contractor shall follow relevant is codes/technical specifications for execution of work.3. the contractor shall maintain good workman ship and follow safe working procedures during the work. earth work earth work excavation in foundations in all soils other than soft and hard rock upto the depths specified below including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soils as directed, within a distance of 50 m etc., complete for foundations, plinth beam etc., a) upto 1.50 m depth from average ground level. b) above 1.50 m to 3.00 m depth from average ground level. earth work in excavation by mechanical means (hydraulic excavator)/manual means in soft rocks over areas including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m
Sector: Power Sector