Description: Overhaul works on Boiler pressure parts for replacement of eroded water wall ,DNP,SH,Platen SH tubes, carrying out cracked fin welding where ever required during D meter survey, Cleaning and clearing the debris and inspecting the orifices inside the Bottom ring Header of Boiler of Unit-7/Stage-IV/Dr.NTTPS during Annual Overhaul period 2024-25.
Sector: Generation