Description: REFURBISHMENT AND UPGRADATION OF OUTFITTING JETTY CRANE TRACK AND SERVICES Name of Work REFURBISHMENT AND UPGRADATION OF OUTFITTING JETTY CRANE TRACK AND SERVICES
Details: SECTION - 1DEMOLTION WORKS Dismantling of Extisting Super Structure Cutting of PCC/Wearing Coat on top surface of the elements specified methodology as specified by the schematic drawings (reinforcement cut as required to facilitate demolition), Cleaning the surface, stacking as stacking area in HSL premises, Disposal of materials away from the site as specified by local authorities and as directed by PMC. Serviceable material resulting from dismantling shall be stacked by Contractor at location as per the directions of the Engineer-in-Charge and shall be property of HSL. Screed/Wearing Coat/Unreinforced Conrete Short Columns, Column Cap and Pile Cap (as specified) Deck Beams Deck Slab a) Cleaning of Marine Growth: M&L for Preparation of existing concrete Tie beams as specified, removal of dry/ oil / sea weed growth/ damp by means of mechanical grinding machine to achieve a rough, coherent substrate having an excellent anchor profile removing all the loose material, rust, dirt etc., c
Sector: Harbor