Details: dismantling a.c. sheet or c.g.i. sheet roofing and / or walling including ridges etc., and stacking the useful materials and removing the debris within a lead of 50 m complete etc., as required and as directed by the engineer-in-charge complete. dismantling rcc/pcc to the required lines and levels by using mechanical equipment of jack hammer including necessary compressor equipment, cutting bits, fuel, operator charges, tools etc., or any other equipment machinery and removing the debris within a lead of 50m including cutting the reinforcement bars and stacking the useful materials, handing over the bars to stores etc., as required and as directed by the engineer-in-charge complete. supplying of structural steel such as ms angles and ms flats as mentioned at site of work including loading, unloading and stacking etc., as required and as directed by the engineer-in-charge, complete. fabricating, welding or revetting or bolting steel built up sections, trusses and framed work includin
Sector: Harbor