Details: dismantling of all non-salvageable items such as brick/stone/block masonry including rcc patli, plaster, dado etc, and all types of floorings without damaging other items using manual/ hammering/compressor for sub structure/ superstructure at all heights at the location shown , providing necessary equipments, scaffolding, stacking of all useful (salvageable) and un-useful (non-salvageable) materials separately as directed by eic.with all labour, loading, transport, unloading and scaffolding upto 5m etc and disposal of debris away from site to designated municipal dumping yard etc,.complete as directed by engineer-in-charge. removing existing wooden partitions, doors, windows, panelling & glazing works from section/frames, anchored to the wall and ceiling or fixed to the wall as per the requirement with all tools and tackles, etc. complete as directed by engineer-in-charge. dismantling & removing of existing stone / ceramic / cc flooring with backing coat including skirting, riser and
Sector: Harbor