Details: labour charges for providing and fixing double scaffolding system (cup lock type) on the exterior side, up to two story height made with 40 mm dia m.s. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with m.s. tubes, m.s. tube challies, m.s. clamps and m.s. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. the scaffolding system shall be stiffened with bracings, runners, connection with the building etc., wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as directed by the site in charge of work. (necessary materials will be supplied by the department) labour charges for reconstruction of the fallen fortification walls using cyclopean stones with available and partly collecting stones 20%, the average size of cyclopean stones of fort wall is 1.00 to 1.
Sector: Museums