Details: trenching in ordinary soil up to a depth of 45 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure) including loading, unloading, carriage and all taxes paid etc. complete as directed by the site in-charge rough dressing the trenched ground including breaking clods, loading, unloading, carriage and all taxes paid etc. complete as directed by the site in-charge flooding the ground with water including making kiaries and dismantling the same including loading, unloading, carriage and all taxes paid etc. complete as directed by the site in-charge uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation including loa
Sector: Museums