Description: Construction of custom bounded wall from sea horse junction to convent junction Arch and compound wall in SBC road including repairs to the existing dust barrier galvalume roof sheeting under fly over bridges Name of Work Construction of custom bounded wall from sea horse junction to convent junction Arch and compound wall in SBC road including repairs to the existing dust barrier galvalume roof sheeting under fly over bridges
Details: Dismantling brick or stone masonry in lime (or) C.M and stacking within a lead of 50 m the useful materials and removing the debris etc., as directed by the Engineer-in-Charge.complete. Earthwork in soft / loose soils in excavation over areas (exceeding 30cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 m and disposed earth to be levelled and neatly dressed etc., as directed by the Engineer-in-Charge.complete. Lift upto 1.5m Lift from 1.50m to 3m depth Shoring and strutting for foundations/pipe line trenches single staging upto 2.5m etc., as directed by the Engineer-in-Charge,complete.All labour and material Bailing out water from foundations/pipe line trenches with oil engine driven pump sets including hire charges, fuel charges and wages for the driver and helper etc., as directed by the Engineer-in-Charge,complete. Supplying and filling in plinth with sand under floors including watering, ramming, consolidating and dress
Sector: Harbor