Description: Shifting and commissioning of three phase double circuit 132 KV NCR Transmission line in connection with proposed rerouting of the 9 nos of 132 KV tower lines of 132KV HNPCLHNPCLAPCLRCLESSRGajuwaka lines which are crossing the main loop railway trac Name of Work Shifting and commissioning of three phase double circuit 132 KV NCR Transmission line in connection with proposed re routing of the 9 nos of 132 KV tower lines of 132KV HNPCL APCL RCL ESSR Gajuwaka lines which are crossing the main loop railway tracks of western sector areas near VPA lands in the jurisdiction of Chief Engineer APTRANSCO Visakhapatnam
Details: SCHEDULE A-ELECTRICAL MATERIAL PORTION -GI Tower Parts GI Tower parts with HT steel angles GI Bolt & Nuts with 2.5% extra 132 KV 120 KN SRC Insulators 132kV 70KN SRC Insulators Al59 Zebra Conductor Suspension Hard ware (Pilot Type) for Al59 Zebra Single Tension Hard Ware for AL59 Zebra Double Tension Hard Ware for AL59 Zebra Vibration Dampers for AL59 Zebra Mid Span Compression Joints for AL59 Zebra Repair Sleeves for AL59 Zebra AAAC panther Conductor Suspension Hard ware (Pilot Type) for AAAC panther Single Tension Hard Ware for AAAC panther Double Tension Hard Ware for AAAC panther Vibration Dampers for AAAC panther Mid Span Compression Joints for AAAC panther Repair Sleeves for AAAC panther Danger Boards with Bolts &Nuts and Washers Number plates with Bolts &Nuts and Washers Phase Plates with Bolts &Nuts and Washers 7/3.15mm HTGS wire Tension hardware with earth bond Mid span compression joints for earth wire Zebra-Zebra C-clamp Panther-Panther C-clamp C-pad clamps for zebr
Sector: Harbor