Description: Lifting and Packing Replacement of Rails PSC Sleepers and through fastening renewal of South of Parallel Bridge Main Line from Ch 0m to 1600m and Conversion of existing fish plated rail joints in to short welded rails joints in Western Sector Name of Work Lifting and Packing Replacement of Rails PSC Sleepers and through fastening renewal of South of Parallel Bridge Main Line from Ch 0m to 1600m and Conversion of existing fish plated rail joints in to short welded rails joints in Western Sector
Details: Transportation of rails up to a distance of 6 km lead, Points and Crossings and P. Way fittings of 52 kg / 90 of varying lengths not exceeding 13 m (42'-8") to anywhere in port area by lorry/ or other means including carriage and handling, loading and unloading by mechanical means (i.e. by crane) and stacking within 30 m lead at nominated area as directed by the Engineer-in-Charge complete including tools, plant and labour charges. Transportation of Pre-Stressed Concrete Sleepers upto distance of 6 km lead of B.G. track size 2750 x 154 / 270 x 235 mm to anywhere in port area by lorry or other means including carriage and handling, loading, unloading by mechanical means (i.e. by crane) and stacking at nominated place as directed by the Engineer-in-Charge complete including tools, plant and labour charges. Linking of BG Track with 60kg/52kg/90R rails on new Pre-Stressed Concrete Sleepers with M+7 density with grooved rubber pads, MS liners and elastic rail clips includ
Sector: Harbor