Description: Supply manning and operating one number circle pump dredger Name of Work Supply manning operating one number circle pump dredger suction pump dredger or any other suitable method for carrying out dredging below deck structure area of pump house no 1 2 3 at NMPA Mangalore
Details: Dredging all types of soil including sand, silt, loose clay and hard /stiff clay below the deck structure area of pump house No.1, 2 &3 from the existing level to (-) 6.00 mCD for 1&2 and (-) 10.00 mCD for Pump house No.3 with a tolerance of +0.5 mts, 18,600 (6200 x 3 years) including and to discharge dredged material to the dock arm areas uniformly beyond a lead of 150m as directed by the NMPA/DCI by deploying a Circle pump Dredger (250 per hour output) or a suction pump dredger or any other suitable method including cost of labour, mobilisation and demobilisation etc., complete for successful completion of work.a) Qty. for First year = 6200 Cu.mb) Qty. for Second year = 6200 Cu.mc) Qty. for Third year = 6200 Cu.m
Sector: Harbor