Description: Dismantling Shifting and Re of 3 nos 30 Mtrs High Mast lighting towers including Providing of new RCC Foundation in connection with expansion Coast Guard road at WOB area of VPA Name of Work Dismantling Shifting and Re of 3 nos 30 Mtrs High Mast lighting towers including Providing of new RCC Foundation in connection with expansion Coast Guard road at WOB area of VPA
Details: ITEM DESCRIPTION Dismantling, Removing of the existing 25/ 30 Mtrs High Mast from existing RCC foundation duly removing of Lantern carriage & Head Frame assembly, wire ropes, cables, Luminaries, Control Gear boxes etc with all accessories from the mast without any damage to the High mast with the help of suitable capacity Crane including transportation loading and un-loading labour tools and tackles as directed by engineer-in-charge. Transportation, & commissioning of the 25/30 mtrs High Mast on the existing RCC foundation and assembly, fixing and commissioning of Lantern carriage & Head Frame assembly wire ropes, cables, luminaries, control gear boxes etc.,to the mast with the help of suitable capacity crane assistance, including transportation loading and un-loading labour tools and tackles, as directed by engineer-in-charge(High Mast & Luminaries will be supplied by VPT at free of cost) Fixing, testing and commissioning of 2 x 400W HPSV/MH flood light luminary duly connecting wi
Sector: Harbor