Details: earthwork in excavation in soft/loose soils over areas (exceeding 30cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 m and disposed earth to be levelled and neatly dressed etc., as requied and as directed by the engineer-in-charge, complete. (a) lift upto 1.5 m, (b) extra for every additional lift of 1.5m or part thereof in soft/hard soil earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 m2 on plan including disposal of excavated earth upto 50 m lead and lift upto 1.5 m disposed soil to be levelled and neatly dressed etc., as required and as directed by the engineer-in-charge, complete. supplying and filling in plinth/ foundations with crusher dust under raft/floors including watering, ramming, consolidating and dressing etc. as required and as directed by the engineer-in-charge, complete. all labour and materials plain cement concrete 1:4:8 nominal mix (using 170kg of ce
Sector: Harbor