Details: surface dressing in soft / loose soil. of the ground including removing vegetations and inequalities not exceeding 15 cm. deep and disposal of lead up to 50 m. and lift up to 1.5m. etc., as required and as directed by the engineering-in-charge complete. filling with available excavated earth (excluding rock) in trenches, plinth sides of foundations etc., in layers not exceeding 20 cm. in depth consolidating each deposited layer by ramming and watering lead up to 50 m. and lift up to 1.5m. etc., as required and as directed by the engineering-in-charge complete.all labour and materials. shoring and strutting for foundations / pipe line trenches single staging up to 2.5m etc., as required and as directed by the engineering-in-charge complete. all labour and material earth work in excavation in foundation trenches or drains not exceeding 1.50 m in width and for wells, man holes and the like not exceeding 10 m2 on plan including dressing of sides and ramming of bottoms, lift
Sector: Harbor