Details: providing and fixing double scaffolding system for all type of works using 40 mm dia m.s. tube 1.5 m centre to centre, horizontal & vertical joining with cup & lock system including necessary working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .the scaffolding system shall be stiffened with bracings, runners,connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of engineer-in-charge (the elevational area of the scaffolding shall be measured for payment purpose .the payment will be made once irrespective of duration of scaffolding). providing, fabricating & erecting temporary supports to the structural members like beams, slabs etc. to relieve the load on the members during breaking of damaged concrete, removal guiniting, excavation or any dismantling work as per the ins
Sector: Industries and Factories