Details: cwsn toilet 2.6.1:earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil od24562/2023-2024:clearing premises and removing the debris by engaging coolie od24563/2023-2024:engaging assistant wood cutter for removing dangerous branches of tree od24564/2023-2024:engaging wood cutter for removing dangerous branches of tree od23429/2023-2024:dry rubble masonry with hard stone in foundation and plinth including levelling up to plinth level 7.1.1:random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:cement mortar 1:6 (1 cement : 6 coarse sand) 2.25:filling available excavated earth (excluding
Sector: PWD