Details: appendix b (premonsoon - work) od39552/2024-2025:lifting, conveying and fixing the old rcc covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete 2.1.1:cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit.<br> girth from 300 mm to 600 mm od38489/2024-2025: supply of mate for wood work/clearing traffic block etc od38490/2024-2025:supply of wood cutter /sawyer for the cutting of fallen trees ,clearing of traffic blocks od38491/2024-2025:supply of man mazdoor for clearing traffic blockages,cutting fallen trees etc 8.9:providing and applying two coats of ready mixed paint of approved brand on steel surface after through cleaning of surface to give an even shade 2.3.2.a:clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs,
Sector: PWD