Details: retaining wall for stream bank stabilization 1.00m height using blasted rubble (564rm) earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil (2.6.1) dry rubble masonry _ dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site (od1246/2023-2024) centering and shuttering including strutting, etc. and removal of form for:foundations, footings, bases of columns, etc for mass concrete(5.9.1) steel reinforcement for r.c.c work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelthermo - mechanically
Sector: Horticulture