Details: investigation work od215703/2023-2024:preparing alignment for the proposed road and drawing out a suitable alignment meeting all requirements of indian road congress(irc). also satisfying the engineering aesthetic and economic requirement designing of horizontal curves (wherever feasible) including spiral transitions and vertical curves after finalizing the alignment and also preparing the ls and cs at an interval of 50m c/c. od217575/2023-2024:providing labour for assisting the departmental staff during the setting out of alignment 8.16:reinforced cement concrete m-15 grade boundary pillars of standard design as per irc:25-19767, fixed in position including finishing and lettering but excluding painting . od62220/2024-2025:taking traffic count at 3 locations in the junction for 12 hours(8.00 am to 8.00 pm)continuously by recording the classified volume count in the prescribed format including necessary arrangements for counting shed,furniture,stationery,labour,preparation of repo
Sector: PWD