Details: construction of building for multipurpose center 2.28.1 : surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead up to 50 m and lift up to 1.5 m.all kinds of soil 2.6.1 : earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 2.7.1 : earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.ordinary rock 2.9.1 : excavation work by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in widt
Sector: Forest and Environment