Details: renovation of pond 50.2.3.1 pumping or bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete 2.6.1 earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 2.26.1 extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.all kinds of soil od994/2023-2024 dry rubble masonry dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of department officers at site 5.9.1 centering and shuttering including strutting, etc. and removal of form for:foundations, footi
Sector: Horticulture