Details: civil works 3.3excavation for road way in soil with dozer including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. 3.4excavation for roadway in ordinary rock by deploying a dozer, 80 hp including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres (average lead 50 metres), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections. od227110/2023_2024excavation in hard rock by drilling holder in boulders using pneumatic compressor, mixing and pouring non-explosive rock spilitting chemical, breaking holder using hydraulically operated breaker, loading by using porcelain, transporting and dumping at specified yard for reuse excavated materials within 1km from site premises and using heavy cutting machine for breaking /dressing boulders
Sector: Industry Development