Details: construction of water harvesting structure - vaidyar kulam (12.00x12.00x4.50m) earth work in excavation by mechanical means (hydraulic excavator) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. all kind of soil (2.6.1) extra for every additional lift 1.5m or part there of in excavation/ banking excavated or stacked materials.all kinds of soil (2.26.1) dr packing under foundation - dry stone packing under foundation with good quality rubble including conveyance of materials and labour charges etc. complete as per direction of departmental officers at site (60.7.2) centering and shuttering including strutting, propping etc. and removal of form work for foundations,footings,bases for columns(4.3.1) centering and shuttering including strutting,etc. and removal of form work forfoundations,footings,bases for columns for
Sector: Horticulture