Details: app.a renovation of pond 2.6.1 : earth work in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.all kinds of soil 60.2.2 : bailing out water using 5hp pump- bailing out water with 5hp engine and pump set including conveyance to site and ,cost of fuel, lubrication oil and other stores, pay of staff etc complete od328713/2023_2024 : dry rubble masonry (without concrete levelling course) with good quality blasted rubble (without bond stone), and packing to compactness to lines and level cost and conveyance of all materials labour charges etc. complete as per direction of departmental officers at site 7.1.1 : random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggre
Sector: Infrastructure