Details: amc od34546/2024_2025 : annual maintenance contract-comprehensive maintenance of lift with ground floor + 6 floors . cost of materials, spares and other items which needs replacement during the contract period is to be met by the contractor within the accepted amount, the lift unit as a whole comes under the preview of the maintenance contract. it should include consumables and machine parts fully. the contractor shall attend the break down calls on receipt of intimation and rectify the defect then and there within reasonable time limits. .the contractor shall examine the lift and carryout the usual maintenance once in every month and replacement / repair of spares and components found necessary in addition to attending unlimited breakdown calls.
Sector: Buildings