Details: synthetic football turf 2.32 : clearing grass and removal of the up to a distance of 50 m outside the periphery of the area cleared. od258650/2023_2024 : filling with contractor's own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering and rolling every 3rd and top most layer with power roller of minimum 8 tonnes, for all leads including all lifts involved as per the direction of site engineer-in-charge. ( based on dsr item no. 50.2.26.1 and 2.2.1) od376050/2023_2024 : providing and fixing pvc pipes with 5 mm dia perforations, minimum 125 perforations per running metre, in trenches at required , as per specifications etc complete including the cost of all materials, labour etc. and as directed by the engineer-in-charge. the rate includes cost of all materials, covering the pipe with geo textile cloth,labour charges for trenching carriage of surplus earth to a lead of 50m etc complete. includin
Sector: Sports