Description: NABARDRIDF 28 Construction of Type3 quarters for Range forest officer in kalpetta Work Name GENERAL NABARDRIDF 28 Construction of Type3 quarters for Range forest officer in kalpetta General Civil Work
Details: Civil work 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil OD135888/2023-2024:DRY RUBBLE MASONRY-Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing compactnessto linesand levels cost andconveyance of all materials labour charges etccomplete as perdirection of departmental officersat site. 4.1.8:Providing and la
Sector: Infrastructure